We usually trestle and board up to lintel height (2.1m), then get the scaffolders to do their thing and erect a proper jobby, for the remainder and roof (single storey) or second lift (two storey).The block wall I'm laying is now too tall and out of reach. I want to get the building to 2.5m.
I was thinking trestles with a scaffold board across the span.
I’ve just got to 3.2m using a ladder.
Holy moly! Where are the guard/grab rails?During my last build I had a JCB lying around, with pallet forks. Very handy for lifting a pack of blocks, bucket of mortar and me into the air. Swapped that for a forklift with a 6m lift that I'd do the same with
If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.
Select the supplier or trade you require, enter your location to begin your search.
Are you a trade or supplier? You can create your listing free at DIYnot Local