Thanks SUNRAY. I've been left no slack whatsoever between roses and switches, so it's all too short, hence the clear-out and upgrade. Also, the single from the Room 2 ceiling rose is really overstressed as it disappears down the conduit switch drop. The PVC sheathing has definitely seen better days.
Thanks again, EFLImpudence, I think that's going to help a lot in the long run.
I'll post a final draught of the diagram soon, which I'll print and use during the upgrade. If anyone notices something that needs a red flag, please chime in.
Thanks again, EFLImpudence, I think that's going to help a lot in the long run.
I'll post a final draught of the diagram soon, which I'll print and use during the upgrade. If anyone notices something that needs a red flag, please chime in.

