New2Game said:Yeah i've checked that and it says acceptable, but other tables for phase conductor state 16mm
RF Lighting said:Table 54H is for sizing the MEBs.
I assume by 'main earth' you mean the wire from the cutout / MET to the CU?
RF Lighting said:Table 54H is for sizing the MEBs.
I assume by 'main earth' you mean the wire from the cutout / MET to the CU?
Spark123 said:For the calcultation, I cannot see how the current nor the time can be calculated in this instance.
EdwardCurrent said:Hope you weren't in a rush New2Game !![]()
Ed