Hello, we are widening an internal doorway and this will involve moving a socket and a light switch. The wiring for them both drops down the wall from under the upstairs floor and so it is just a case of moving the point at which the cabling drops down and then refitting the socket and switch.
It looks to me like this job in non-notifiable under part P, is that correct? and if so does that mean I am OK to do this work myself? I have done this sort of work before and thus am OK to do the job but am not qualified and wanted to ensure I was not stepping outside the current regs.
Thank you.
It looks to me like this job in non-notifiable under part P, is that correct? and if so does that mean I am OK to do this work myself? I have done this sort of work before and thus am OK to do the job but am not qualified and wanted to ensure I was not stepping outside the current regs.
Thank you.