Hello all,
Need to install a bulkhead light, switch for said light, single or double socket and an outside pir bulkhead light, this is on a farm.
This is for a viewing box for an indoor arena, will need to be waterproof, although it won't be getting wet as such. No outside cables.
The feed currently is a 4mm swa to a waterproof outside socket (mounted inside) this is run from a 32a mcb, rcd protected CU.
So I'm thinking...- from the org socket, run 4mm swa to water proof jun box inside viewing area.. And this is where my mind goes blank..
Or run 4mm swa to double waterproof socket, then from there to a FCU, then run the rest in 1mm or 1.5mm in trunking?
Do I need 2 fcus? One for the light and one for the outside light?
Does that make sense?
Thanks in advance.
Need to install a bulkhead light, switch for said light, single or double socket and an outside pir bulkhead light, this is on a farm.
This is for a viewing box for an indoor arena, will need to be waterproof, although it won't be getting wet as such. No outside cables.
The feed currently is a 4mm swa to a waterproof outside socket (mounted inside) this is run from a 32a mcb, rcd protected CU.
So I'm thinking...- from the org socket, run 4mm swa to water proof jun box inside viewing area.. And this is where my mind goes blank..
Or run 4mm swa to double waterproof socket, then from there to a FCU, then run the rest in 1mm or 1.5mm in trunking?
Do I need 2 fcus? One for the light and one for the outside light?
Does that make sense?
Thanks in advance.