Hi All,
We are in the middle of digging new foundations for a new steel frame of my house back wall and we found a 20cm (outer diamter) sewers pipe going directly under the exiting foundations (55cm below the existing house concrete slab).
The builder proposes to dig under the pipe and lay the steel beam there, however, I think this is unnecessary work as we have just enough height to do the work over the pipe.
I am looking for 2nd opinion regarding both proposals.
Please find attached both proposals below.
Thanks
We are in the middle of digging new foundations for a new steel frame of my house back wall and we found a 20cm (outer diamter) sewers pipe going directly under the exiting foundations (55cm below the existing house concrete slab).
The builder proposes to dig under the pipe and lay the steel beam there, however, I think this is unnecessary work as we have just enough height to do the work over the pipe.
I am looking for 2nd opinion regarding both proposals.
Please find attached both proposals below.
Thanks