When the DNO supply new PME supply, with DP Isolator do they leave access into earth terminal to connect earth or is that sealed? What is normal procedure/practice?
 
Sponsored Links
Usually have access to conect your 16mm earth into it. Won't be sealed up at all, but some of them put the earth in for you.
 
Normally the cutout will be left fully sealed, with the suppliers earth from the cutout terminated into a SP henley block, which is where you would connect your earth to.
 
Sponsored Links
there must be variations

I have seen cases where they have fitted a new service head and poked the consumer's existing bit of rusty old earth wire to it, and sealed it shut.

I would have said it is best to put a nice new piece of 16mm G&Y, that reaches their position and is connected to your MET or earth block ready for them to connect for you to avoid any difficulty wanting to connect it later after they have sealed the terminal
 

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Back
Top