I have to relocate my sewer inspection chamber due to a new extension I am building, can anyone tell me if there are there any regulations to take account of? Also, the new extension will contain a wet room/wc but the floor level will only be three inches above the outside ground level meaning the waste water pipe will emerge below ground. How do I build the remaining underground pipework to the inspection chamber?