hi, i am in the process of screwing my floor boards down and am very worried about hitting the central heating pipes. i am 95% sure that i have located the pipes in each room. there are 2 pipes that come into the room that i can see. would there be anymore under the floor or can i presume that the rest of the floor is clear and screw nails anywhere? i need add screws to the middle of the floorboard as adding at the side is not fixing the problem.
thanks
jql
thanks
jql