floor cabinets first. they are the most difficult to position and level etc with all the appliances, unsquare wallls at corners etc and will need most adjusting
wall units next as they need to line up with the floor cabinets below.
tiling last as it allows tiles to overhang worktop for better seal and any slight chasing that needs doing to plaster for out of square walls in relation to cabinets/worktops can be done.
wall units next as they need to line up with the floor cabinets below.
tiling last as it allows tiles to overhang worktop for better seal and any slight chasing that needs doing to plaster for out of square walls in relation to cabinets/worktops can be done.
