• Looking for a smarter way to manage your heating this winter? We’ve been testing the new Aqara Radiator Thermostat W600 to see how quiet, accurate and easy it is to use around the home. Click here read our review.

Order of work, patio, drainage, steps

Joined
28 Oct 2017
Messages
176
Reaction score
0
Country
United Kingdom
In the attached image I’ve tried to show the bits of additional work required as part of my patio project. Aside from the patio floor there is also an ACO drain running the length, a new gully just around the corner out of shot, a step to the back door and also a split level step up to the garden. I am wondering what is the best order to start the work in?
The ACO drain will be 1 flag away from the house.
The top step is at the same level as the grass.
The steps will be the same flag as the patio, layer on concrete blocks.

Many thanks
 

Attachments

  • iOS Image - 1753104023.jpg
    iOS Image - 1753104023.jpg
    484.1 KB · Views: 243
But measure from the desired finished ground level down to ascertain the required depth, ensuring you have allowed for the required layers and amount of cover, and the drain levels/falls.
 

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Back
Top