yesterday I laid a patio 1.8m x 2.4m (600mm x 600mm concrete slabs)
8cm of MOT type 1
3.5cm of sharp sand and cement
slabs were 3.5cm thick

All seems to be ok, I'm happy with the job! after laying them it's been almost 24 hours now laid on Easter Friday and today hot!

I can't perform the jointing till later next week, is this an issue or does the jointing need to be done after 24 hours?

Also I'm using Sika Setting sand, the reason is because it looks easy! and I have a nice buff colour to match the slabs, my joints are approx 10mm. Is Sika Sand like concrete and will this bond ok with my gap size? I'm a little worried as ordered a 5.5' W and 7 L Alu Greenhouse and I need a strong base.

Cheers.
 
Sponsored Links

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Back
Top