Hi guys.
After digging up some soil, putting a sub-base of hardcore and filling up with dry mix, shall i fill up with dry mix up to the level or shall i leave it just a bit short to allow for the thickness of the slab? If i fill up to the desired level with dry mix and lay out my 25 mm thick slabs, then even though i hammer them down with a rubber mallet will i manage to hammer them down to the require level? Thank you so much for your help
After digging up some soil, putting a sub-base of hardcore and filling up with dry mix, shall i fill up with dry mix up to the level or shall i leave it just a bit short to allow for the thickness of the slab? If i fill up to the desired level with dry mix and lay out my 25 mm thick slabs, then even though i hammer them down with a rubber mallet will i manage to hammer them down to the require level? Thank you so much for your help