Pictures Not Of The Week.

Joined
11 Jan 2004
Messages
42,765
Reaction score
2,641
Country
United Kingdom
Shower switch in Z1:

ShowerSwitchZoneOne.jpg


How not to terminate SWA:

SWAMeetsConsumerUnit.jpg


Zoom in & spot the defects...

MGBoardLidOff.jpg
 
Sponsored Links
3 black wires going into the thing 3 in form the isolator
also a mk mcb when the preferred way on this board would be a merlin genrin...

go me!
 
3 black wires going into the thing 3 in form the isolator


That is part of a DP RCBO.

It is normal to have neutrals connected to this.

Simon, I cant zoom in very well. Can you post a link to a bigger version of the picture?
 
thanks RF didnt realise that

found 'nother prob:
the T+E coming in 3 modules after the RCBO
the earth has been snipped off!
or its 2 core cable. but with a board like that i heavily doubt that.
i also see the swa has been taken out and plastic glad was used (i think)
also, is that and RCD on the top of the case? were you replacing something?
 
Sponsored Links
I've got a theory

There is an RCBO sat on top on the DB.

The RCBO requires 2 modules.

Someone has added a new circuit (the one on the MK MCB).

The DB was full so they removed the RCBO and just stuck it on a normal MCB


images
 
main earth into board is 6mm

something gone wonky with that module in the middle(the more i zoom the worse the )pic gets) and the black switch above it is off
 
Open gland in top of CU?
Circuits not in same order on Neutral and Earth as the MCBs
Are the grommets installed in the bottom?
Can't make out the MCB sizes, are these all correct?
Incoming terminal shroud not fully covering the terminals.
 
Sorry, guys. I've tried to post a bigger, clearer picture, but photoshop fails me...

But, top marks RF! And Spark 123 as well.

That MK breaker is a 40A affair, with 2 x 2.5mm² cables run to it.

The second one in is a 50A breaker with 6mm² attached.

This was fitted for an 8.5kW shower after the muppet "spark" removed a 20A RCBO feeding a shed (seen on the top), and rewired the shed feed in those 2 x 2.5 cables and the 40A breaker.

The same muppet spark fitted the shower iso in Z1, telling the customer,

"It has to go very close to the shower in case you scald yourself....."

The customer responded, "Surely it's quicker to switch off at the shower?"

His reply, "What if that fails?"

The real irony....The shower isolator had jammed... ;)
 
hi im new here been sparky for 5 years now just sort of introducing my self, now i am sure that the main earth is to small. and on the left the earth block has been painted over :eek: sort of voids the testing part there.
 
Earth block mate on the left outside of the consumer unit. the cu earth looks well lose aswell and wall looks possible damp beneath it.
 
on the left the earth block has been painted over :eek: sort of voids the testing part there.

He is correct, there is a main earthing block under the CCU to the left, which has been painted over in white.
 

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Sponsored Links
Back
Top