Hi all,
Wont bore you with the full story but have built a small utility room at the side / back of house. Had Building Control involved..no problem, all signed off. Did I need planning permission..'yes you do' ... 'no you don't '...yes you do..'no you don't, it's within permitted development' 'no it's not'
Deary me !! Looked on planning portal and spoke to planning dept. Anyway apparently in my case it's a grey area !! My question is ; Is there a time limit after something is built after which point I can't be forced to take it down ? Someone says it's four years..someone else said 10 years, then 12 !!Nobody's complained about it by the way. Thanks in anticipation.
Wont bore you with the full story but have built a small utility room at the side / back of house. Had Building Control involved..no problem, all signed off. Did I need planning permission..'yes you do' ... 'no you don't '...yes you do..'no you don't, it's within permitted development' 'no it's not'
Deary me !! Looked on planning portal and spoke to planning dept. Anyway apparently in my case it's a grey area !! My question is ; Is there a time limit after something is built after which point I can't be forced to take it down ? Someone says it's four years..someone else said 10 years, then 12 !!Nobody's complained about it by the way. Thanks in anticipation.