Hi there
please help me understand what is right See Photo on my profile re wall and Lines.
mid terrace house, party wall between me and a neighbour here.. our back garden line is out by 11" or so, adding space to my garden. since it was laid out.
the old concrete posts and wire fence line placed by the council when the property was built back in 1930's or so.
I might add that my neighbours previous owner built a block wall on his side, upagainst the concrete council fence line thus moving the line towards him some 3" not including the block thickness of 8 or 9"
problem is this
do i build upto ( centre of the concrete posts = 9" from party wall centre )the old orginal conrete fence line which is out from the centre of my party wall?
or do i Build upto or near the surface of my neighbours block wall ( 11" out from centre of party wall to surface of his block wall.
Or do I build from centre line of party wall? and lose 11" or so and make it dead space for everyone due to the block wall.
the original problem i have, i think all started from the main down pipe for the shared guttering came down right on the line of the old concrete fence line so they moved the underground pipe onto my land as it is now. but the fence line should have been relocated 9" nearer to me to be in line with the party wall. and thus not having the clay pipe on my land. as the downpipe and clay soil pipe would still be on his land.
what do i do
as it is sunday and i am chompin at the bit to find out more and plan accordingly because the conservatory is starting work this comming week, and no one is available to find out asap
please help me understand what is right See Photo on my profile re wall and Lines.
mid terrace house, party wall between me and a neighbour here.. our back garden line is out by 11" or so, adding space to my garden. since it was laid out.
the old concrete posts and wire fence line placed by the council when the property was built back in 1930's or so.
I might add that my neighbours previous owner built a block wall on his side, upagainst the concrete council fence line thus moving the line towards him some 3" not including the block thickness of 8 or 9"
problem is this
do i build upto ( centre of the concrete posts = 9" from party wall centre )the old orginal conrete fence line which is out from the centre of my party wall?
or do i Build upto or near the surface of my neighbours block wall ( 11" out from centre of party wall to surface of his block wall.
Or do I build from centre line of party wall? and lose 11" or so and make it dead space for everyone due to the block wall.
the original problem i have, i think all started from the main down pipe for the shared guttering came down right on the line of the old concrete fence line so they moved the underground pipe onto my land as it is now. but the fence line should have been relocated 9" nearer to me to be in line with the party wall. and thus not having the clay pipe on my land. as the downpipe and clay soil pipe would still be on his land.
what do i do
as it is sunday and i am chompin at the bit to find out more and plan accordingly because the conservatory is starting work this comming week, and no one is available to find out asap