Hi,
I have laid new floor in the Bathroom and I went under my Loo. My problem is because the Loo has been raised about 8mm I cannot reach to reconnect it to the service value.
Normally this would not be a big problem, I would cut pipe and extend to reach, but I only have 20mm of pipe below the service valve before it is all boxed in and tiled over. I only need to reach about 8mm, I not sure what I sould do next.
Any body got any Ideas?
I have laid new floor in the Bathroom and I went under my Loo. My problem is because the Loo has been raised about 8mm I cannot reach to reconnect it to the service value.
Normally this would not be a big problem, I would cut pipe and extend to reach, but I only have 20mm of pipe below the service valve before it is all boxed in and tiled over. I only need to reach about 8mm, I not sure what I sould do next.
Any body got any Ideas?
