Building Control visited and approved the 600mm fill. I specifically pointed out that the finished floor level of the extension would match the existing house floor level. I don’t think I’ll be ripping it out; instead, I’ll look at ways to rectify the issue.
Building Control visited and approved the 600mm fill. I specifically pointed out that the finished floor level of the extension would match the existing house floor level. I don’t think I’ll be ripping it out; instead, I’ll look at ways to rectify the issue.
If you need to find a tradesperson to get your job done, please try our local search below,
or if you are doing it yourself you can find suppliers local to you.
Select the supplier or trade you require, enter your location to begin your search.
Please select a service and enter a location to continue...
Are you a trade or supplier? You can create your listing free at DIYnot Local