So let's say I bought a old house that needed a full re-wire for example and I wanted to do the re-wire all myself (obviously complying to BS7671), what is the process regarding involving the local councils building control when doing notifiable electrical work under Part P.
I assume you need to notify them before you start anything, and they will want to expect it at several stages along the way, but I’m not 100% sure how it works in practice?
How does the process work when using the councils building control as opposed to a person registered with a Part P scheme such as a normal qualified electrician. This relates to Liverpool if at all relevant.
Regards: Elliott.
I assume you need to notify them before you start anything, and they will want to expect it at several stages along the way, but I’m not 100% sure how it works in practice?
How does the process work when using the councils building control as opposed to a person registered with a Part P scheme such as a normal qualified electrician. This relates to Liverpool if at all relevant.
Regards: Elliott.