Question about fuseboard for EICR

Joined
27 Aug 2010
Messages
25
Reaction score
0
Location
Middlesex
Country
United Kingdom
Looking for some guidance here
The left hand side fuse box in the pic only have 2 fuses which are used for economy 7 storage heaters, rest of the fuses are in the right hand side fuse box. bot the fuse box serves same property, I am applying for EICR and there is one question in the checklist where it assumes that the EICR is for 1 fuse board. what will above be considered as ?
thank you for the guidance in advance.

1753891241194.png
 
You will have one EICR for the whole property. The EICR will have a number of sheets, for a property with one consumer unit (CU) there will be one sheet that has the circuit designations and test results for the circuits on that one CU. As you have two CUs, you should have two circuit details sheet, one for each consumer unit.
simples!
 
Thank you for all helpful answers.
The E7 CU will not be live during the day time. I hope that is understood and test will still be carried out?
 
All testing can be done with no power and "live results" calculated, I prefer a good live test myself but you've got to do what you've got to do.
 
What do you mean applying for ?

Why are you think you need an EICR?

Could you post a photo showing the circuit breakers with the front cover open?
 
What do you mean applying for ?

Why are you think you need an EICR?

Could you post a photo showing the circuit breakers with the front cover open?
this is BTL property that we recently bought and we need to get the EICR done before we rent it out hence i need EICR.
 
this is BTL property that we recently bought and we need to get the EICR done before we rent it out hence i need EICR.

Ok.

When an EICR is ordered / agreed with a competent person the scope and limitations need to be agreed before it starts.

Unless you are happy to pay a night rate for the spark to test during the E7 hours you’ll need to agree that dead tests will only be completed on the E7 board. This board will not have the Ze confirmed either
 

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Back
Top