I've perfectly mixed 3-1 some cement for repointing but after 1.5 days, the 1st batch of cement is still as dark as the bit I did late last night ie. no change in colour. Will it dry a lighter grey? It's not outside although in a kitchen with no external doors so would have thought the air would have been sufficient to start drying it out.
I'm a bit con concerned it'll look a bit patched if it doesn't dry in.
Thanks
I'm a bit con concerned it'll look a bit patched if it doesn't dry in.
Thanks