Following my thread from earlier in the week I have had now had a price (£3700) for the rewire of my four bedroom house.
This includes a new CU as well.
Replacing all existing sockets about 25 + extra 5 new ones
rewire of all lights in each room.
Install of a separate switch in the house for a pond pump.
Install of two sec lights at back and side of house.
replacement of spot lights in bathroom with new compliant ones.
wiring to boiler.
plastering
testing and paperwork.
One thing that struck me is the length of time required for the work.
A week of chasing and wiring, a week for plastering and then 2.5 days for final stuff to include testing.
A spark and another guy (for the chasing and lifting on the job).
I'll be pulling up carpets before the come.
Is this reasonable or a rip off?
I'm based in the NW.
This includes a new CU as well.
Replacing all existing sockets about 25 + extra 5 new ones
rewire of all lights in each room.
Install of a separate switch in the house for a pond pump.
Install of two sec lights at back and side of house.
replacement of spot lights in bathroom with new compliant ones.
wiring to boiler.
plastering
testing and paperwork.
One thing that struck me is the length of time required for the work.
A week of chasing and wiring, a week for plastering and then 2.5 days for final stuff to include testing.
A spark and another guy (for the chasing and lifting on the job).
I'll be pulling up carpets before the come.
Is this reasonable or a rip off?
I'm based in the NW.