hi
can someone tell me who is responsible for
1. main rcd the one where the suppliers cable goes in as it does not work and i have been told by 2 electricians that technically they should disconnect.
2. pme grounding as i have to put a new consumer in and its a slit load one.
as the old one is too out dated,and i have overhead cable which does not have the correct earthing
thanks
 
if your incoming cable goes directly into an rcd THEN the meter that would make it on your suppliers side so it is theirs, if it is after the meter it is yours.

your supplier is responsible for P.M.E. Earthing. there should be a separate earth block with a label stating something like "this is a protective multiple earthing installation, do not interfere with earth connection"
 

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Back
Top