hi
can someone tell me who is responsible for
1. main rcd the one where the suppliers cable goes in as it does not work and i have been told by 2 electricians that technically they should disconnect.
2. pme grounding as i have to put a new consumer in and its a slit load one.
as the old one is too out dated,and i have overhead cable which does not have the correct earthing
thanks
can someone tell me who is responsible for
1. main rcd the one where the suppliers cable goes in as it does not work and i have been told by 2 electricians that technically they should disconnect.
2. pme grounding as i have to put a new consumer in and its a slit load one.
as the old one is too out dated,and i have overhead cable which does not have the correct earthing
thanks