I'm going to install a recess shower door and tray, but need advise on the best way to build the stud walls. Tray has 3 tiling upstands.
Should I plasterboard (12.5mm) to floor then line with plastic sheet, fit tray, then fix 9mm aquapanel down to tiling upstand and fill any gaps with sealant.
or would it be better to use 9mm plasterboard and tank.
or install tray against timber and then just use 12.5mm plasterboard + tank.
or is there a better way.
Thanks