- Joined
- 13 Nov 2010
- Messages
- 95
- Reaction score
- 0
- Country

Within the alarm panel there's a supply cable that runs in parallel with the pcb within the alarm panel. In the new onsite guide on pg 75 it says 50mm space. To follow this rule I was thinking of running the cable outside the panel in parallel to the bottom edge as far over as possible. Then using the break in points to get into the panel and upto the terminal block.
Having some trunking in the middle of the wall doesn't look very nice. since it's underneath the stairs can I not clip the supply cable direct onto the wall? I know sparks do that in garages.
Any advice will be appreciated
http://imageshack.us/photo/my-images/607/imag0020c.jpg/
http://imageshack.us/photo/my-images/850/trunking.gif/
Having some trunking in the middle of the wall doesn't look very nice. since it's underneath the stairs can I not clip the supply cable direct onto the wall? I know sparks do that in garages.
Any advice will be appreciated
http://imageshack.us/photo/my-images/607/imag0020c.jpg/
http://imageshack.us/photo/my-images/850/trunking.gif/