- Joined
- 14 Feb 2021
- Messages
- 24
- Reaction score
- 0
- Country
I'm just prepping the floor ready for SBR primer and then self levelling mix.
What's the best way of protecting the waste pipe area in the ground so the self levelling goes around it nicely making sure none goes inside? Ive seen someone create a 'dam' using foam and then cut it away and make good the area afterwards. Is there a simpler/better way?
Thanks
What's the best way of protecting the waste pipe area in the ground so the self levelling goes around it nicely making sure none goes inside? Ive seen someone create a 'dam' using foam and then cut it away and make good the area afterwards. Is there a simpler/better way?
Thanks