We have had to take a couple of rads off while some plastering was done.
We have now fitted the rads back on and need to top up the combi with some Sentinel X100 Inhibitor.
With some water drained off the system will we be able to pour the Inhibitor through the filling loop on the combi? (bleed key open on rads to let air out while filling)
Or our we better off removing a blanking plug from the top of rad or towel warmer in the bathroom and pouring it in there?
thanks.
Boiler make = Glow-worm Ultracom 30cxi
Brand new rads and full pipe work fitted 10 months ago.
Chrome Towel Radiator from screwfix.
We have now fitted the rads back on and need to top up the combi with some Sentinel X100 Inhibitor.
With some water drained off the system will we be able to pour the Inhibitor through the filling loop on the combi? (bleed key open on rads to let air out while filling)
Or our we better off removing a blanking plug from the top of rad or towel warmer in the bathroom and pouring it in there?
thanks.
Boiler make = Glow-worm Ultracom 30cxi
Brand new rads and full pipe work fitted 10 months ago.
Chrome Towel Radiator from screwfix.