- Joined
- 30 Nov 2015
- Messages
- 206
- Reaction score
- 5
- Country
I'm refitting my shower room in an old house. Got the room stripped back to posts. When I come to sheet round the 3 adjacent walls that will make the shower enclosure I was thinking of ply sheeting it first then the moisture resistant plasterboard. Or I could double sheet the plasterboard. Single sheeting doesn't seem enough although it's probably the norm?
It will be fully tiled eventually.
Thanks
It will be fully tiled eventually.
Thanks