1. Visiting from the US? Why not try DIYnot.US instead? Click here to continue to DIYnot.US.
    Dismiss Notice

Shocking quote

Discussion in 'Electrics UK' started by G1nzo, 6 Oct 2019.

  1. G1nzo

    G1nzo

    Joined:
    5 Sep 2006
    Messages:
    81
    Thanks Received:
    0
    Country:
    United Kingdom
    What do you guys think about this quote
    Power 2 garage
    Armoured cable already run
    We are supplying MK Metal CU
    5 double sockets (metal) supplied to fitted along the wall
    1 led light fitting on joist also supplied
    2 way metal light switch one on each door Also supplied

    Electrician to supply 10 metres black conduit
    Gland for armoured cable
    Other end already gland fitted
    10m 2.5mm TE cable and his time
    CU and sockets already mounted

    His quote £425

    Newbury Berkshire

    I can only see max £50 parts
     
  2. flameport

    flameport

    Joined:
    10 Mar 2007
    Messages:
    8,172
    Thanks Received:
    1,501
    Location:
    Poole, Dorset
    Country:
    United Kingdom
    Would appear to be 1 day + 50% extra for the inevitable problems involved in completing someone else's half finished project.
     
    • Like Like x 2
  3. chivers67

    chivers67

    Joined:
    18 Nov 2008
    Messages:
    963
    Thanks Received:
    99
    Location:
    Surrey
    Country:
    United Kingdom
    If it already is terminated/glanded at the Supply end where's the second Gland gone as they normally come in pairs?

    £300 including Test Certificate sounds fairer
     
  4. Risteard

    Risteard

    Joined:
    18 Jun 2010
    Messages:
    1,842
    Thanks Received:
    124
    Location:
    Derry, Ireland
    Country:
    Ireland
    Sounds fine to me, and also don't agree that £50 materials will cover that.
     
  5. G1nzo

    G1nzo

    Joined:
    5 Sep 2006
    Messages:
    81
    Thanks Received:
    0
    Country:
    United Kingdom
    Its no ones half finished job
    Its a new built workshop less than a week old
    The armoured cables run in
    I have supplied everything else apart from some conduit which is not expensive and £25 of cable
     
  6. ajstoneservices

    ajstoneservices

    Joined:
    1 Aug 2008
    Messages:
    6,036
    Thanks Received:
    895
    Location:
    Cambridgeshire
    Country:
    United Kingdom
    How much do you think he should charge?
     
  7. Notch7

    Notch7

    Joined:
    15 Sep 2017
    Messages:
    12,995
    Thanks Received:
    1,015
    Location:
    Sussex
    Country:
    United Kingdom
    £45.70
     
  8. Simon35

    Simon35

    Joined:
    27 Sep 2011
    Messages:
    447
    Thanks Received:
    47
    Location:
    Yorkshire
    Country:
    United Kingdom
    How is the cable run, can the electrician inspect the complete run?
     
  9. ericmark

    ericmark

    Joined:
    27 Jan 2008
    Messages:
    14,278
    Thanks Received:
    1,257
    Location:
    Llanfair Caereinion, Nr Welshpool
    Country:
    United Kingdom
    There are three ways to price a job, day rate you pay according to how long job takes, risk of over run is yours, estimate not fixed but gives you an idea of costs, quote the risk is the electricians if quick he gains if slow he loses, the latter the work is carefully detailed and you could still be libel for extras, like waiting time if some thing delays him like a car parked in the garage.

    So my son fitted a consumer unit for me, there were problems so two days to complete, he travelled 100 miles each day, I did not pay him as such, but I would say £200 was a fair amount plus I took grand children on the local train for the day.

    Electricians should not really work alone, although second man may not be an electrician, so one day for two men even minimum wage with government on costs over £10 per hour so minimum charge would likely be £200 as one could hardly do a second job that day, so must be a days wage for 2 men, even if he takes a chance and does not use second man, he must allow for using one.

    And not included travel, so it's not a silly quote, and I know there were some jobs I simply did not want, often a good client so could not refuse, but I would give a high quote, and often say, you may find some one who can do this cheaper, I am out of my comfort zone with this one, if I did get the job, I could sub contract it.

    Maybe he saw all that radio gear and it frighted him John you never know?
     
  10. winston1

    winston1

    Joined:
    11 Jan 2010
    Messages:
    4,981
    Thanks Received:
    353
    Location:
    London
    Country:
    United Kingdom
    Someone ran the cable in! But maybe you are right, it is someones quarter finished job.
     
  11. aptsys

    aptsys

    Joined:
    16 Sep 2007
    Messages:
    1,649
    Thanks Received:
    123
    Location:
    Cambridgeshire
    Country:
    United Kingdom
    Seems fair to me assuming no surprises. Testing and documentation takes time too.
     
  12. oldbutnotdead

    oldbutnotdead

    Joined:
    11 Jan 2013
    Messages:
    2,112
    Thanks Received:
    362
    Location:
    Durham
    Country:
    United Kingdom
    What did the other quotes come in at? TBH it is a bit steep but you are in the affluent south. If you've got the time and skills to spare you might be able to drop the price a bit by acting as the 2nd man (did this on mine- drilled holes in walls, fixed all the saddles, box covers, backboxes etc)
     