Bathroom will have a bath with an incorporated shower
Some of the wall in the bath/shower area is plasterboard.
However the majority is breeze block which has been plastered over
Does the masonry area need to be tanked prior to tiling?
Some of the wall in the bath/shower area is plasterboard.
However the majority is breeze block which has been plastered over
Does the masonry area need to be tanked prior to tiling?