Mom and Dad are going on holiday next month and are having the bathroom done while they are away ( trusting huh..? )
I'm trying to talk them into having a towel radiator fitted while they are re-tiling it all..
they don't want one but I'm thinking of going in and putting the flex outlet and FCU in the airing cupboard anyway.. that way it's there if they change their minds at any point and won't mean cutting a tile out to fit the box..
just stick a blank over the box where the flex outlet plate would go..
I'm trying to talk them into having a towel radiator fitted while they are re-tiling it all..
they don't want one but I'm thinking of going in and putting the flex outlet and FCU in the airing cupboard anyway.. that way it's there if they change their minds at any point and won't mean cutting a tile out to fit the box..
just stick a blank over the box where the flex outlet plate would go..
