Hi,
I'm preparing to lay a sub base for a 12m by 8m gravel driveway, planning on laying 150mm depth sub base.
Made some inquires about mot type 3 as i'm ideally looking for a permeable sub base and most mentioned mot type 1 reduced fines as an alternative.
Has anyone use reduced fines type 1, whats it like in comparison and will it be suitable.
Thanks
I'm preparing to lay a sub base for a 12m by 8m gravel driveway, planning on laying 150mm depth sub base.
Made some inquires about mot type 3 as i'm ideally looking for a permeable sub base and most mentioned mot type 1 reduced fines as an alternative.
Has anyone use reduced fines type 1, whats it like in comparison and will it be suitable.
Thanks