We do shops and they have two 1250 amp 3 phase airbreakers and the busbars can be linked via castell units to temporary run from one transformer.
Recently we had problems and in this particular shop i was asked whether it would overload 1 transformer, without knowing the size of the units and there was no access then one could only assume it was designed for this.
He later asked network power when they arrived and thinks they said one was a 4 and the other one was an 8, so what would they have meant by that and what sort of load would they be cabable of.