When its time to supp. bond the bathroom, not sure whether I'll be able to run it in the safe zones (might be able to sneak it into a corner one at a push), but I'm not actually sure its a requirement to run it in a safe zone, with protection, or 50mm deep.
Anyone got any knowledge one way or other?
Thanks
P.S. Anyone able to tell me the logic behind having to bond a lighting circuit thats going to supply selv fixtures in a bathroom just because there is class 2 pullcord in zone 3?...
P.P.S. Used 25mm PVC conduit in the end for the other shower, went to the orange and black shed and tested 10mm twin+e for size in a piece, plenty of room, slides in like *ahem* and well under 45% fill factor
P.P.P.S I've got a place on the 2330 at newark from sept
Anyone got any knowledge one way or other?
Thanks
P.S. Anyone able to tell me the logic behind having to bond a lighting circuit thats going to supply selv fixtures in a bathroom just because there is class 2 pullcord in zone 3?...
P.P.S. Used 25mm PVC conduit in the end for the other shower, went to the orange and black shed and tested 10mm twin+e for size in a piece, plenty of room, slides in like *ahem* and well under 45% fill factor
P.P.P.S I've got a place on the 2330 at newark from sept