Hi all
I am installing a suspended timber floor in my new workshop.
I am using 4x2 joists supported at 1.6mtr spacing on sleeper walls.
As the joists will be fixed to the sleeper walls, do i need to put in noggins? and if i do how far apart? My floor is 5mtrs x 15mtrs.
second question: I am using 22m flooring chipboard do i need to glue the tongues and should i fix it to joists or leave it floating?
also what paint can i use on the chipboard?
Thanks
Mike
I am installing a suspended timber floor in my new workshop.
I am using 4x2 joists supported at 1.6mtr spacing on sleeper walls.
As the joists will be fixed to the sleeper walls, do i need to put in noggins? and if i do how far apart? My floor is 5mtrs x 15mtrs.
second question: I am using 22m flooring chipboard do i need to glue the tongues and should i fix it to joists or leave it floating?
also what paint can i use on the chipboard?
Thanks
Mike