- Joined
- 18 Mar 2021
- Messages
- 10
- Reaction score
- 0
- Country
Hi 16mm 4 core swa in trench to metal container 180 metres we gonna tt it. Was gonna put it on a 32 amp fuses at the beginning and 25 amp rcbo 30ma at end by dB. for compressor. sound ok to stop tripping at beginning? Mate is electrician and will do connecting once I buried cable Sound ok?