- Joined
- 20 Jan 2005
- Messages
- 20
- Reaction score
- 0
- Country
Following advice on here I have started preparing my bathroom floow for tiling. This involved removing the chipboard floor and getting the plumbing laid (done) and then cutting in new chipboard (Done) to lay down the WBP Ply for the tiles.
I decided before laying the ply to check the floor level and found that in a room approx 2.5 m sq it slopes down to a 1.3 cm drop over the last 80 cm of the room. This is consistent accross the whole room.
So can anyone help me with the best way to fix this ??
Thanks in advance.
I decided before laying the ply to check the floor level and found that in a room approx 2.5 m sq it slopes down to a 1.3 cm drop over the last 80 cm of the room. This is consistent accross the whole room.
So can anyone help me with the best way to fix this ??
Thanks in advance.