On my brothers roof the end column of tiles at the verge have all slipped down, so the tiles, tile and half, cement verge and undercloak have all slipped down and away from the next tiles. So looks like last time the roof was done the roofer has cut the battens too short and so there is nothing holding up these end tiles. Whats the best way of resolving this. I think battens are probably about 1 to 2 inches too short so I was just thinking of screwing some short lengths of batten through the ends into the existing battens. Does anyone have any thoughts on this.