Hello,
After pulling up the carpet, underlay and vinyl tiles laid by the builders the bare concrete was showing signs of damp as i tested the floor with my cheep damp meter. (I believe the cause of the damp was due to the front door not being sealed round the frame which i have now .)
The floor isnt wet to touch.
How long should i leave the floor exposed before lay the new tiles?
After pulling up the carpet, underlay and vinyl tiles laid by the builders the bare concrete was showing signs of damp as i tested the floor with my cheep damp meter. (I believe the cause of the damp was due to the front door not being sealed round the frame which i have now .)
The floor isnt wet to touch.
How long should i leave the floor exposed before lay the new tiles?

