Hi, quick question...
I'm in the middle of finishing a downstairs room and am left with the Solid Oak floors to be sanded and the rest to be painted (walls and ceiling etc).
What do you Pro's do first? My dilemma is that if I do the walls first, then when I sand I end covering the lovely new paint (Farrow and Ball) in saw dust.
Alternatively, if I do the floors first, I will end up covering them in the paint etc.
Maybe the answer is Floors then walls and cover the floor? But just wondered what the trade done on this one?
Thanks....