2.4m deep lol, with 1.5m of made up ground to get through and a mass filled conservatory footing to hoof out/cut through in the process.
2.1m deep. LOL
Correct, but at that depth it requires a minimum 3 tonner and that's on max dig with the machine right on the edge of the trench.made up ground can be stable enough to cut trenches without the sides collapsing......
It was not an enjoyable dig. At one stage I was perched atop of the old existing foundations with a heavy electric Hilti breaker in hand, trying to cut through the concrete whilst stopping myself being dragged by the weight of the Hilti, into a 2.4m drop below.