Water pooling on concrete

Joined
16 Dec 2020
Messages
75
Reaction score
1
Country
United Kingdom
Hi all,

I've just dug 5 concrete pad holes (450mm square) yesterday and found water standing on them at a depth of about 1 inch after i put the concrete in, i made a 1:8 mix for footings and 3 of the holes (after about an hour or so) seemed to dry out and looked ok so i expected the other 2 to do the same but this morning i've checked them and they're all under water (about 2 inches) as it's rained last night ?
Am i ok to leave them or should i try and remove the standing water and then cover them over a bit ?

Thanks
 
Sponsored Links
Don't worry about the water- concrete cures better when its damp, depending how deep your pads are you might want to water them every day for a week or so.
Do cover them up- hessian is the usual, anything to stop them actually freezing.
1:8 of what?
 

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Sponsored Links
Back
Top