• Looking for a smarter way to manage your heating this winter? We’ve been testing the new Aqara Radiator Thermostat W600 to see how quiet, accurate and easy it is to use around the home. Click here read our review.

What are you off over Christmas?

Joined
16 Sep 2006
Messages
7,503
Reaction score
2,210
Location
Fife
Country
United Kingdom
I finish up on the 22nd Dec, work a day between Christmas and New Year, back to work on the 3rd Jan.
 
Christmas Day off, probably Boxing Day as well, along with New Year Day.

I am self employed and have a "she wot scowls at me" indoors...
 
luckily - now retired - so have loads of time over xmas
with a family and divorced , it was always difficult to work out when working - usually i had the 3 workdays Off between boxing day and new year
 
Paid the lads until the end of the week, but finished today. I've asked them to do a couple of hours in the morning WD40'ing the tools, changing blades, charging batteries, maybe wash the van etc.
Back on the 8th provided I don't have any skiing hiccups. Finished a 7 month contract out in the back of beyond, working for some wealthy but nice folk. The last job we did was the image below. Can anyone spot the difference..... :mrgreen:


 
Second photo at a slightly different angle and flagstones dug from in front of patio.

I'm off until end of life because, I too have fully retired. :cool:
 
Over the wall on the left, new structure/thingy below dormer?
 
one of the first jobs i had, Electronics field Engineer , i had to do a full car stock take on christmas eve morning , loads and loads of electonic components ... all paper work and had to be posted off. But no time off over xmas
As a computer field Engineer , i was often on call over the xmas period, no kids at that time , so happy to be paid to be on standby
 
I should've been a surveyor, could have done it without getting out of the car...
 
Well I was planning to be off all this week, then a mate asked me to help him refurb 3 windows: timber subframe steel crittall type opening sashes, individual georgian leaded lights. It’s a listed building, built 1700s, windows are in a right state, we’ve in the process of remaking 8 of the leaded lights (individually soldered lead cane), remove bottom rails scarf jambs and the brickwork below the cill was a split course and it’s all crumbling so will be needing to that too. “Couple of days” said my mate :ROFLMAO:

I had promised to do some work at stuff at home, now a bit delayed and in the dog house. Oops

On the plus side the Customer popped out for a chat and gave me a bottle of decent Rioja.

Im taking Jan off to make and fit a new kitchen at home
 
I should've been a surveyor, could have done it without getting out of the car...
I did give you a clue though.. :mrgreen:

Been a good job overall. We contracted to knock the connies down and re-build them. Ended up copping for all the groundwork too...


 
Back
Top