- Joined
- 12 May 2007
- Messages
- 292
- Reaction score
- 2
- Country
I have fitted my new bath, had it square all over, screwed in some wall brackets and has pulled it slightly down at one end towards the taps. Should i run tiles straight off the bath and correct at the ceiling or should i make a straight line 1 tile above the bath and then cut tiles to suit at the bath level? Talking around 3mm difference from each end of bath