Hi everyone, first post here so go easy........
Wifey and I have just bought a house. 2 bed, end terrace 1960s flat roof.
Thing is we've got three major jobs that we think need to be done but can only afford to get one done now, others will have to wait until we've saved.
1: Roof, no leaks as yet but loosk very old a tatty compared to neighbours.
2: Central heating, works but very noisy, slow and innefficient. Also giving lousy water pressure due to scaled up pipes.
3: Wiring, we've got a few sockets and lights we'd like moved but apart from that the kitchen wiring needs totally replacing. There are no power points in there and everything is run from extension leads. Very dodgy.
Anyway... What do you reckon should be our priority?
Thanks.
Wifey and I have just bought a house. 2 bed, end terrace 1960s flat roof.
Thing is we've got three major jobs that we think need to be done but can only afford to get one done now, others will have to wait until we've saved.
1: Roof, no leaks as yet but loosk very old a tatty compared to neighbours.
2: Central heating, works but very noisy, slow and innefficient. Also giving lousy water pressure due to scaled up pipes.
3: Wiring, we've got a few sockets and lights we'd like moved but apart from that the kitchen wiring needs totally replacing. There are no power points in there and everything is run from extension leads. Very dodgy.
Anyway... What do you reckon should be our priority?
Thanks.