After a spell of unemployment I have just started work as a maint Electrician in a holiday camp, previously all the electrical work was done and some still is by a local NICEIC contractor , since working there I have discovered some outragous bodgeing, eg the RCD feeding the some showers
by- passed because of a intermint tripping fault, a 2 gang13A socket spurred of in a length of 1.5mm, the T&E feeding from several of the consumer units has been lengthened by just twisting it together and then covered with tape, and the worst seen so far, the front of a large old DB board has been removed (exposing buss bars) because a replacement 50A threephase MCB would not fit and then the replacement breaker has been left dangling out the front in mid air. just above head hight and over a sink unit used by bar staff. There is a lot more more and I will try and up load pics next week.
I have highlited these to my Maintenance Manager who doesnt see it as a problem and thinks I am being bolshie what do you thing my next move should be ? should I contact H&S Excutive or local Council.
by- passed because of a intermint tripping fault, a 2 gang13A socket spurred of in a length of 1.5mm, the T&E feeding from several of the consumer units has been lengthened by just twisting it together and then covered with tape, and the worst seen so far, the front of a large old DB board has been removed (exposing buss bars) because a replacement 50A threephase MCB would not fit and then the replacement breaker has been left dangling out the front in mid air. just above head hight and over a sink unit used by bar staff. There is a lot more more and I will try and up load pics next week.
I have highlited these to my Maintenance Manager who doesnt see it as a problem and thinks I am being bolshie what do you thing my next move should be ? should I contact H&S Excutive or local Council.