Worktop tile trim

Joined
5 Feb 2007
Messages
1,202
Reaction score
19
Location
Liverpool
Country
United Kingdom
Getting above kitchen worktops re tiled.

There was a tile trim.along worktop. Upon removing tiles there is a 15mm gap at back of worktop which is what trim was for.

I cannot find these trims. Anyone know where to get thrm or another way of doinv it to cover the gap ?

Thanks
 

Attachments

  • Screenshot_20260620_132707_WhatsApp.jpg
    Screenshot_20260620_132707_WhatsApp.jpg
    102.7 KB · Views: 23
This would work and match the crome l trime I have. This site doesbt show prices amd these seem hard to find anywhere else.

Anyone know a website what sells them for delivery ?
 

Attachments

  • Screenshot_20260620_144639_Chrome.jpg
    Screenshot_20260620_144639_Chrome.jpg
    157.8 KB · Views: 15
Photo too poor but most tile shops should sell what you need .
Don’t usually trim the base only the top of tile .
 
Fill out the gap between the wall and the worktop with strips of cardboard from the tile boxes. Pack them tight and your first row of tiles will sit on them no problem.
If you’re using big heavy tiles and the gap is worrying in places, then put said cardboard in a thin batch of tile adhesive and make your own ‘paper mache’ like when in school.
It all sounds very unorthodox, but it works !

( whatever you do, don’t put trim on the bottom:- how you gonna silicone that ? )
 
Fill out the gap between the wall and the worktop with strips of cardboard from the tile boxes. Pack them tight and your first row of tiles will sit on them no problem.
If you’re using big heavy tiles and the gap is worrying in places, then put said cardboard in a thin batch of tile adhesive and make your own ‘paper mache’ like when in school.
It all sounds very unorthodox, but it works !

( whatever you do, don’t put trim on the bottom:- how you gonna silicone that ? )
You do not silicone with the trim it seals it.
 

Attachments

  • Screenshot_20260623_140411_Chrome.jpg
    Screenshot_20260623_140411_Chrome.jpg
    115.1 KB · Views: 5
Fill out the gap between the wall and the worktop with strips of cardboard from the tile boxes. Pack them tight and your first row of tiles will sit on them no problem.
If you’re using big heavy tiles and the gap is worrying in places, then put said cardboard in a thin batch of tile adhesive and make your own ‘paper mache’ like when in school.
It all sounds very unorthodox, but it works !

( whatever you do, don’t put trim on the bottom:- how you gonna silicone that ? )
Tiles are metro . Worried about the finish using cardboard to build out that much. Still would need to get bigger trim for sides I think
 
The trims won’t seal it :- I’m assuming there’s a sink somewhere in the worktop that will need silicone on the bottom row of tiles behind the taps ?
With an 8mm notched trowel ( condensing to 5 or 6mm after you have pressed in) + a 7mm tile, you are only a couple of mm short ( thickness of a silicone bead ).
You could even take that up with some small “ dabs “ on the back of the tiles at the biggest gap. It’s hard to advise without knowing how plumb your wall is.
However, given the fact that it is Metros you are fitting, I’d be inclined to fix the wall properly before you start- either thin plasterboard or 6mm Hardie.
With respect, a ‘newbie’ tiler will never be able to pull off a 200x100 metro brick effect wall on a substrate that is not plumb or straight ( i.e. not curved on the horizontal plane) without highly visible Lippage.
 

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.