I need to put a temporary supply into a marquee for a wedding. The loads are as follows.
1 x 3.1 Kw oven
2 x 3 kw hot cupboard
2 x 2 kw water heater
3 x 500w max fridge
2.1 kw of lighting
How can diversity be applied to the above, trouble is all this stuff is going to be on the same time.
Now according to my figures after diversity I am looking at about a 61A supply, going to be an expensive job I think as the run to the farm house where the supply comes in is about 60m so I havnt got my tables here but I'm probabily looking a a kmf 80A switch fuse and 25mm swa, unless you can see I have done the diversity figures a bit wrong.
1 x 3.1 Kw oven
2 x 3 kw hot cupboard
2 x 2 kw water heater
3 x 500w max fridge
2.1 kw of lighting
How can diversity be applied to the above, trouble is all this stuff is going to be on the same time.
Now according to my figures after diversity I am looking at about a 61A supply, going to be an expensive job I think as the run to the farm house where the supply comes in is about 60m so I havnt got my tables here but I'm probabily looking a a kmf 80A switch fuse and 25mm swa, unless you can see I have done the diversity figures a bit wrong.