Here you go then. Doing a mains upgrade at a site (some twit installed around 50kW of heating onto an already well loaded SP 18kW supply!). Same chap added a new light in the cupboard with the fuse boards in. I get the reasoning.......but really?
Yep. It bugs me when people go in and swap out fuse boards for dual splits, with no consideration. In commercial installs you do not want everything on RCDs.
Some lifts in smaller commecrial buildings only require a 16A SP supply these days, generally only go up one or two floors and don't generally have a lift motor room, normally just a small hydrallic unit about 1m tall and 600-800m wide.
Generally go in buildings which would in years gone by would have never had a lift, but need to these days for disabled access
If you need to find a tradesperson to get your job done, please try our local search below,
or if you are doing it yourself you can find suppliers local to you.
Select the supplier or trade you require, enter your location to begin your search.
Please select a service and enter a location to continue...
Are you a trade or supplier? You can create your listing free at DIYnot Local