hello
I have received the following quote: is it reasonable?
● Changing of pipework from 15 to 22mm for central heating in kitchen and dining area and hall way
● Changing of mains isolation valve
● Installation of new plumbing work in bathroom in preparation for wet room
● Moving of radiator in front room and installation of additional radiator in the front room
● Installation of Plume kit for boiler
○ Labour = £2,600.
○ Materials = £600.
In addition, if you wanted room thermostat, it would be £120 for the thermostat and £75 for the installation.
Cost of timer for boiler = £65 and cost of installation would be £45
another plumber is asking for £140 a day for 10 days work plus materials.
I have received the following quote: is it reasonable?
● Changing of pipework from 15 to 22mm for central heating in kitchen and dining area and hall way
● Changing of mains isolation valve
● Installation of new plumbing work in bathroom in preparation for wet room
● Moving of radiator in front room and installation of additional radiator in the front room
● Installation of Plume kit for boiler
○ Labour = £2,600.
○ Materials = £600.
In addition, if you wanted room thermostat, it would be £120 for the thermostat and £75 for the installation.
Cost of timer for boiler = £65 and cost of installation would be £45
another plumber is asking for £140 a day for 10 days work plus materials.